Hotel Renovation Estimates

Hotel renovation cost estimates for buyers, owners and lenders

Under contract on a hotel with a PIP? Our hotel renovation cost estimates give you a defensible, line-by-line renovation budget in about a week, priced from real projects across Marriott, Hilton, IHG, Hyatt, Wyndham, Choice and independent brands.

  • Line-item budget by area: guestrooms, public space, exterior, MEP
  • FF&E, OS&E, soft costs and contingency broken out
  • Clear notes on assumptions and PIP items that drive cost
  • Fixed fee, quoted up front. Typical turnaround: 5 business days

Request a PIP estimate ↓

How it works: 1) Send the basics in the form below. 2) We reply within one business day with a fixed fee and timeline, and ask for the PIP and room matrix. 3) You get your estimate in about 5 business days.

Priced from actual costs on 80+ hotel projects, adjusted for the current construction index and brand FF&E pricing. We work in all 50 states, from New York to Hawaii.

What drives PIP cost: limited-service hotels | full-service hotels | for lenders and brokers

Already have a number? Get a second look | 8 mistakes we find in PIP budgets | instant vs. line-by-line estimates

Request an Estimate

Hotel renovation estimating, line by line

Our hotel renovation cost estimates are full, line-by-line PIP budgets: every PIP item or scope item, with a quantity, a unit cost and a total, split between furniture (FF&E) and contractor work. They are built by people who manage hotel renovations, not generated by a calculator, so the numbers hold up when the work is bid.

Who it’s for

Renovated hotel lobby, the kind of public-space scope priced in our hotel renovation cost estimates
  • Buyers under contract. You have a PIP and a closing date. You need a number you can underwrite and negotiate with.
  • Owners planning capital. A PIP, a relicensing or a brand conversion is coming and you need to know the cost before you commit.
  • Lenders and brokers. You need an independent renovation budget to size a loan or support a sale. See For Lenders and Brokers.
  • Asset managers. You need a capital plan across one hotel or a portfolio.

What’s in our hotel renovation cost estimates

  • Every PIP or scope item priced, grouped by area: site and exterior, public space, food and beverage, fitness, pool, meeting rooms, guestrooms and life safety.
  • Accessibility and life-safety items flagged for review by licensed specialists, since those depend on the building, not the brand.
  • Furniture and contractor costs shown side by side, so you can see what is purchased and what is built.
  • Soft costs carried separately: tax, freight, tariffs, warehousing, design, purchasing, contractor overhead, project management and contingency.
  • Every assumption and exclusion written down, so you know which quantities still need to be confirmed on site.
  • Scope gaps and items to clarify with the brand, the seller or the contractor.
  • Value options: items where a lower-cost way to do the work could bring the total down.
  • Recommended next steps for getting from the estimate to a bid-ready project.

What to send us

Start with whatever you have. We will tell you what else would sharpen the number.
  • The PIP, or a description of the planned scope
  • Hotel name or brand, location and room count
  • Room mix (kings, queens, suites) if you have it
  • Floor plans, a property condition report or recent photos, if available
  • Your target date: closing, loan commitment or PIP deadline

How our hotel renovation cost estimates work

  1. Intake. Send the basics through the form above. We reply within one business day with a fixed fee and a timeline.
  2. Scope review. We read the PIP and the documents and list anything unclear.
  3. Clarification. We check open questions with you before pricing them.
  4. Estimate. We price every line from our cost history and current pricing.
  5. Quality check and delivery. A second review of quantities and math, then the estimate, assumptions and exclusions go to you.

What a hotel PIP estimate is not

  • It is not a contractor bid or a guaranteed final cost.
  • It does not replace destructive testing, engineering or trade verification of concealed conditions.
  • It does not certify code compliance. Accessibility and life-safety items are flagged for licensed specialists.
Not sure how an estimate differs from a bid? See instant vs. line-by-line estimates.

See a sample estimate

Want to see what you get before you call? Enter your name and email and download a sample PIP budget. It uses real line items with every hotel detail removed, and the figures are for illustration only.

How we price hotel renovation cost estimates

Unit costs come from actual costs on 80+ hotel renovation projects and $250M+ in completed work, updated for current construction and furniture pricing. We price limited-service, select-service and full-service hotels across the major brand families and independents, in all 50 states.

Hotel renovation estimate FAQ

How long does it take? About five business days from when we receive the PIP or scope and the room count. What does it cost? A fixed fee, quoted up front, based on the size of the hotel and the scope. Do I need a PIP? No. We can price a PIP, a brand conversion, a planned renovation scope, or the work found in a property condition report. Is this a bid? No. Hotel renovation cost estimates are planning-level numbers to support a purchase, a loan or a capital plan. Ours are built in the same format contractors bid in, so bids can be compared line by line. Can you review a number I already have? Yes. See our PIP budget review, including budgets built with AI or estimating software. Can you manage the work too? Yes. Many clients keep us on as owner’s representative through hotel renovation project management, bidding and closeout. Request a hotel renovation estimate ↑

PIP Budget Stress Test

Twelve quick questions to see whether your PIP budget will hold up once the work is bid. No numbers needed: just answer Yes, No or Not sure. Our team will review your answers and follow up within one business day with the gaps we see.

Take the free hotel renovation budget stress test →

Contact Us
Scroll to Top